
As Windsor is crippled by the Walker Road closure, you don’t hear too much about the status of the project these days.

With nearly no one around, and Walker Rd. silent, I decided to take a trip down there to see what’s going on.

It looks like the tracks have been raised significantly from where the grade crossing was before construction was.

The Bridge appears to be partially in place, and it looks like there is the beginnings of the underpass being dug out.
Good too see that this project is rolling along.

